I work for a Power Plant and have a question about Arc Flash requirements. Our 345kV breakers have Arc Flash ratings of 68 calories with a Flash Boundary of 111 ft. The breaker control panel is approx 16 ft from the breakers. The panel has local controls, but we actuate the breakers remotely. My question is regarding basic maintenance in the breaker control panels. Can we open the local control panel doors while the breaker is energized? The 'energized device' is not behind the panel door as with most switchgear. We don't require Arc Flash PPE just to walk through the area, why would opening the control panel door be different? Our intent with opening the panel door is not to actuate the breaker, just check hyd fluid levels, etc. We do not allow local actuation as the calories are too high for PPE to be effective.


Top
 Profile Send private message  
Reply with quote  
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 1 post ] 

All times are UTC - 7 hours


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Jump to:  
© 2022 Arcflash Forum / Brainfiller, Inc. | P.O. Box 12024 | Scottsdale, AZ 85267 USA | 800-874-8883