 Post subject: new main swichgear breaker , does it help?
PostPosted: Sun Feb 07, 2010 5:07 am 

Joined: Sun Nov 16, 2008 12:01 pm
Posts: 44
If using the tables require an analysis of the electrical system because the size of the electrical service to the plant is too large [4000a 480v] , would upgrading or replacing the main cb so it is inside the parameters set by nfpa70e be enough to be able to use the task tables ? or is more needed?
Thanks for all the great help.


Top
 Profile Send private message  
Reply with quote  
 Post subject:
PostPosted: Sun Feb 07, 2010 7:04 am 
Plasma Level

Joined: Mon Jun 02, 2008 11:58 am
Posts: 1103
Location: Charlotte, NC
PUCKMAN wrote:
If using the tables require an analysis of the electrical system because the size of the electrical service to the plant is too large [4000a 480v] , would upgrading or replacing the main cb so it is inside the parameters set by nfpa70e be enough to be able to use the task tables ? or is more needed?
Thanks for all the great help.


You can upgrade your main to use a arc flash reduction switch, that will help your clearing time issues but canging the main won't change the available fault current, if that exceeds the limits of the tables you will need to do an analysis.

However. even if you are inside the limits, with a 4000A service I highly recommend doing an analysis.


Top
 Profile Send private message  
Reply with quote  
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 2 posts ] 

All times are UTC - 7 hours


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Jump to:  
© 2019 Arcflash Forum / Brainfiller, Inc. | P.O. Box 12024 | Scottsdale, AZ 85267 USA | 800-874-8883