Arc Flash Forum
https://brainfiller.com/arcflashforum/

In-service component displaying as de-energized when cloned
https://brainfiller.com/arcflashforum/viewtopic.php?f=23&t=4635
Page 1 of 1

Author:  Canuckeng [ Thu Apr 19, 2018 10:25 am ]
Post subject:  In-service component displaying as de-energized when cloned

Just curious why a component (fuse, wire, bus/panel) when placed as new components shows in-service and energized but when cloned the bus shows de-energized until the next load is drawn on the model?

Somethnig I find annoying to the flow of building the model. I am sure it is user error.

Thanks

Tim

Author:  bbaumer [ Thu Apr 19, 2018 12:54 pm ]
Post subject:  Re: In-service component displaying as de-energized when clo

Haven't had that problem.

I have had on occasion a cloned bus lose its connection and I have to re-connect it to the cloned cable but never gone from in service to out of service.

Must be a setting of some sort.

Sorry.

Author:  PaulEngr [ Sun Apr 22, 2018 5:49 am ]
Post subject:  Re: In-service component displaying as de-energized when clo

I would think that the reason is because you just copied/pasted and still need to edit it anyways (fix all the labeling, settings, etc.), so it's a great way to remind you to review everything in the cloned branch before it goes live in the model.

Page 1 of 1 All times are UTC - 7 hours
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group
http://www.phpbb.com/