How much energized work do you/your company/client perform?
We NEVER work energized 15%  15%  [ 6 ]
We do SOME energized work 69%  69%  [ 27 ]
We do MOSTLY energized work 10%  10%  [ 4 ]
We do ALL energized work 5%  5%  [ 2 ]
Total votes : 39
Author Message
 Post subject: How Much Energized Work?
PostPosted: Sun Mar 11, 2012 7:55 am 
Plasma Level
User avatar

Joined: Mon Sep 17, 2007 5:00 pm
Posts: 1737
Location: Scottsdale, Arizona
OSHA and NFPA 70E strongly encourage working only on electrical systems that have been placed into an electrically safe working condition. Although this is strongly encouraged, it is not always possible.

This week's question:

How much energized work (not an electrically safe working condition) do you/your company/client perform?
  • We NEVER do energized work
  • We do SOME energized work
  • We do MOSTLY energized work
  • We do ALL energized work

_________________
Jim Phillips, P.E.
Brainfiller.com


Top
 Profile Send private message  
Reply with quote  
 Post subject:
PostPosted: Mon Mar 12, 2012 6:40 am 

Joined: Wed Oct 06, 2010 12:30 pm
Posts: 1
Every effort is made to work deenergized, but how do you make final connections to a 125 VDC battery bank deenergized?


Top
 Profile Send private message  
Reply with quote  
 Post subject:
PostPosted: Fri Mar 16, 2012 11:06 am 

Joined: Wed Oct 20, 2010 11:46 am
Posts: 12
most of our electricians will work most things hot. there's an old mindset at our utility that we're not bound by osha. this is slowly changing as the industry is changing. we're also implementing the 70E guidelines and starting an arcflash program, but with hundreds of facilities out there, it's going to take a while to perform the studies and label everything. also, changing the mindset of some of the guys, who were raised on working things hot, is a challenge. all we can do is inform them and put them at notice that if they aren't geared up according to the label, they'll be at fault.

we're trying to perform our diligence and keep people safe, but designing according to accepted standards and practices with fiscal constraints in mind, it's difficult to design a facility that completely eliminates the human element and poor decision factors.


Top
 Profile Send private message  
Reply with quote  
 Post subject:
PostPosted: Fri Mar 16, 2012 9:24 pm 
Sparks Level

Joined: Thu Oct 18, 2007 7:10 pm
Posts: 262
Location: NW USA
Continuous process plant doesn't allow shutting down MCC's to insert or withdraw buckets so that is occasionally done hot, but often delayed until the next scheduled shutdown.


Top
 Profile Send private message  
Reply with quote  
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 4 posts ] 

All times are UTC - 7 hours


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Jump to:  
© 2022-2025 Arcflash Forum / Brainfiller, Inc. | P.O. Box 12024 | Scottsdale, AZ 85267 USA | 800-874-8883