It is currently Mon Sep 27, 2021 7:01 am



Post new topic Reply to topic

Do you bid/perform/specify short circuit/coordination studies as part of the arc flash study?
Yes
No, we use existing studies
A mix – many studies sites/clients involved
Not applicable to me
You may select 1 option

View results
Author Message
 Post subject: Short Circuit and Coordination Studies with Arc Flash Study?
PostPosted: Sun Jun 20, 2021 7:34 am 
Plasma Level
User avatar

Joined: Mon Sep 17, 2007 5:00 pm
Posts: 1620
Location: Scottsdale, Arizona
This week’s question is about performing a short circuit and coordination study as part of an arc flash study.

Technically, these two studies are a separate analysis but yet their results are necessary for performing incident energy calculations.

I still hear some say they perform the study based on existing short circuit and coordination studies that are available (the age of the studies is for another discussion)

This week’s question is pretty simple:

Do you bid/perform/specify short circuit/coordination studies as part of the arc flash study?

Yes
No, we use existing studies
A mix – many studies sites/clients involved
Not applicable to me


Report this post
Top
 Profile Send private message  
Reply with quote  
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 1 post ] 

All times are UTC - 7 hours


You can post new topics in this forum
You can reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Jump to:  
© 2019 Arcflash Forum / Brainfiller, Inc. | P.O. Box 12024 | Scottsdale, AZ 85267 USA | 800-874-8883