What do you guys use as a standard or outline on what to include in an AFS report? |
|
| Author: | Zog [ Thu Apr 05, 2012 1:19 pm ] |
| Post subject: | |
Are you asking what to put on an RFQ? |
|
| Author: | JL7 [ Mon Apr 09, 2012 5:12 am ] |
| Post subject: | |
Not necessarily, just wondering what the industry standard is to provide a client when producing a written report with TCC curves/1 lines/ etc.. |
|
| Author: | engrick [ Mon Apr 09, 2012 6:59 am ] |
| Post subject: | |
our typical reports include: Executive summary report - describing findings - very detailed Appdendixes input data arc flash data (study options and output) onelines (input and arc flash) TCC's as required (mitigation, cat 4 and dangerous) unless coordination is required |
|
| Author: | gilmomoney [ Mon Apr 09, 2012 9:58 am ] |
| Post subject: | |
whether we perform the studies or have them performed as part of an install contract, we typically include the below listed items. since we're an owner instead of a 1x engineering firm, we rely on current and past studies to update our systems and models, so some of the below info might be too extensive to include in a typical report. what engrick said above, plus: PE of record's license information and resume the .dez file (EasyPower(EP)) or the copy of whomever's software you would use utility data, and their point of contact one-line diagram with load flow, power flow, short circuit, transient motor starting, harmonics if there are substantial numbers of drives, etc. OCPD schedules, ratings, settings, etc. system and load info: MCC and panelboard schedules conductor and conduit schedules printed out from EP source scenarios: standby generators, tie-breakers, UPSes, etc. DC-system modeling lastly, PDF copies of the labels they'll be filling out and afixing to the equipment. |
|