Author |
Message |
anjali14
|
Post subject: Utility data, 40% rule etc..... Posted: Sat Feb 07, 2015 7:54 am |
|
Joined: Sat Feb 07, 2015 7:47 am Posts: 2
|
Hi,
I am trying to understand the process of doing an arc flash study. Our company is planning to outsource the work and I am asked to at least draft a scope of work document. Have anyone here have a template they can help me get started. I am a control engineer with basic electrical training from my college day
|
|
Top |
|
 |
wbd
|
Post subject: Re: Utility data, 40% rule etc..... Posted: Mon Feb 09, 2015 8:32 am |
|
Plasma Level |
 |
Joined: Wed May 07, 2008 5:00 pm Posts: 831 Location: Rutland, VT
|
Get a copy of IEEE 1584.1 which deals with the scope of a arc flash study...should be very helpful
_________________ Barry Donovan, P.E. www.workplacesafetysolutions.com
|
|
Top |
|
 |
anjali14
|
Post subject: Re: Utility data, 40% rule etc..... Posted: Fri Feb 20, 2015 4:42 am |
|
Joined: Sat Feb 07, 2015 7:47 am Posts: 2
|
Hi,
I am trying to understand the process of doing an arc flash study. Our company is planning to outsource the work and I am asked to at least draft a scope of work document. Have anyone here have a template they can help me get started. I am a control engineer with basic electrical training from my college day
|
|
Top |
|
 |
wbd
|
Post subject: Re: Utility data, 40% rule etc..... Posted: Fri Feb 20, 2015 7:03 am |
|
Plasma Level |
 |
Joined: Wed May 07, 2008 5:00 pm Posts: 831 Location: Rutland, VT
|
anjali14 - see post above yours which refers to obtaining IEEE 1584.1 to develop a scope of work.
_________________ Barry Donovan, P.E. www.workplacesafetysolutions.com
|
|
Top |
|
 |
|
Page 1 of 1
|
[ 4 posts ] |
|
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot post attachments in this forum
|
|