Jim Phillips answers people’s questions that are sent during an on line program about arc flash studies. Questions include:
- What to do for a circuit breaker between a generator and main bus?
- Can the 2 second cut off be used?
- Can you use a generic arc flash label until a study is performed?
- Should the term “exposed and energized” be incorporated on the arc flash label?
- Is there an agency such as OSHA that enforces the 5 year arc flash study review cycle?
- When will the next edition of IEEE 1584 be published?