The NEC contains specific articles that dictate when you shall ground, when you shall not ground, and when you are permitted – but not required – to ground. These code requirements are based on various factors such as whether or not there are connected phase to neutral loads, whether only qualified persons service the installation, and operating voltage levels.
Jim Phillips, P.E. – April 2005 – NECDigest
Download Article: Grounding Power